Our Remodeling Process

A proven 6-step journey to your dream bathroom transformation

The RicarBathPlan Process

Our proven approach ensures quality results and a stress-free experience

At RicarBathPlan, we've perfected our bathroom remodeling process over 15 years and 500+ projects. Our systematic approach ensures that every project runs smoothly, stays on budget, and exceeds expectations. We believe that clear communication, meticulous planning, and expert execution are the keys to successful bathroom transformations.

Unlike other contractors who may rush through the process, we take the time to understand your vision, create detailed plans, and execute with precision. This methodical approach not only produces superior results but also minimizes stress and surprises for our clients.

Why Our Process Works
  • Predictable Timeline: No guesswork - we stick to our schedules
  • Transparent Communication: Regular updates and clear expectations
  • Quality Assurance: Multiple checkpoints ensure excellence
  • Budget Control: No hidden costs or surprise expenses
  • Stress-Free Experience: We handle all the details so you don't have to
Our Track Record
98%
On-Time Completion
4.9/5
Customer Satisfaction
500+
Projects Completed
15
Years of Excellence
Our Guarantee

We stand behind our work with a 2-year warranty on all labor and workmanship. If anything isn't perfect, we'll make it right.

Our 6-Step Process

From initial consultation to final walkthrough, here's how we bring your vision to life

1

Discovery Consultation

We meet at your home to discuss your vision, assess your space, and understand your needs and budget. This no-pressure meeting helps us determine if we're the right fit for your project.

What Happens:
  • In-home consultation (60-90 minutes)
  • Detailed discussion of your vision and goals
  • Complete assessment of your current bathroom
  • Budget range discussion
  • Answer all your questions
2

Design & Planning

We create detailed plans including layout designs, material selections, and a comprehensive project proposal. This phase ensures we're all aligned before any work begins.

What Happens:
  • Custom design plans and 3D renderings
  • Material and fixture selection
  • Detailed project proposal with fixed price
  • Project timeline development
  • Permit requirements assessment
3

Scheduling & Preparation

Once you approve the plan, we schedule your project and handle all necessary permits. We also help you prepare for the remodel with guidance on temporary arrangements.

What Happens:
  • Project scheduling and confirmation
  • Permit applications and approvals
  • Material ordering and delivery scheduling
  • Pre-construction meeting
  • Home preparation guidance
4

Demolition & Rough-In

We carefully remove existing materials and complete all structural work, plumbing, and electrical rough-in. This is when the transformation really begins.

What Happens:
  • Professional demolition with dust control
  • Structural modifications if needed
  • Plumbing and electrical rough-in
  • Waterproofing membrane installation
  • Inspection scheduling and approval
5

Installation & Finishing

We install all new materials including tile work, fixtures, cabinetry, and final finishes. This phase brings your beautiful new bathroom to life.

What Happens:
  • Tile installation and grouting
  • Fixture and hardware installation
  • Cabinetry and countertop installation
  • Painting and final finishes
  • Final inspections and approvals
6

Final Walkthrough

We conduct a comprehensive walkthrough with you to ensure everything meets our high standards and your expectations. We also provide care instructions for your new bathroom.

What Happens:
  • Complete walkthrough and inspection
  • Operation instructions for fixtures and features
  • Care and maintenance guidance
  • Final payment processing
  • Project documentation and warranty information

Communication & Updates

We believe clear communication is key to a successful project

How We Keep You Informed

We understand that remodeling can be disruptive, so we make it our priority to keep you informed and involved throughout the process. Our communication approach ensures you're never left wondering what's happening with your project.

Daily Check-Ins

Your project manager will check in with you daily to provide updates and answer any questions.

Progress Reports

Weekly email updates with photos and progress summaries keep you informed of milestones.

Schedule Updates

We provide advance notice of any schedule changes and coordinate around your needs.

Open Communication

We're always available to answer questions and address concerns throughout your project.

What to Expect During Construction

While we strive to make the remodeling process as smooth as possible, it's helpful to understand what to expect during construction. We take every precaution to minimize disruption to your daily life.

Timeline

Most bathroom remodels take 4-8 weeks. We provide a detailed timeline upfront and stick to it.

Dust Control

We use professional dust containment systems to minimize mess and protect your home.

Access

We'll need access to your bathroom and some adjacent areas for materials and equipment.

Water

Your water will be shut off during plumbing work. We coordinate this to minimize inconvenience.

Quality Assurance

Our multi-step quality control process ensures excellence in every detail

1
Material Inspection

Every material and fixture is inspected upon delivery for quality and damage before installation.

2
Mid-Project Review

We conduct thorough inspections during key phases to ensure work meets our standards.

3
Final Inspection

A comprehensive final inspection covers every aspect of your new bathroom before client walkthrough.

Our Quality Standards

  • Plumb Walls: All walls perfectly vertical
  • Level Fixtures: All fixtures perfectly level
  • Proper Sloping: Showers slope correctly for drainage
  • Waterproofing: All wet areas properly sealed
  • Grout Lines: Consistent, clean grout lines
  • Clearances: Proper clearances around fixtures
  • Functionality: All fixtures operate smoothly
  • Finish Quality: No scratches, dents, or damage

Ready to Start Your Project?

Experience our proven process for yourself

No obligation • Transparent pricing • Stress-free experience